• last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
script to workaround issue w/ missing buildNumber.properties files
    • -0
    • +11
    ./AdminConsole_EAP_5_1/touch-buildNumber-properties-files.sh
upgrade version of RHQ dep from 3.0.0.EmbJopr3 to 3.0.0.EmbJopr4 in preparation for 1.3.4.SP5 release
[EMBJOPR-259] prevent large uploade ears or wars from taking up lots of heap as follows: 1) have Seam inject the uploaded ear or war file into the component as an InputStream rather than as a byte[], and 2) configure the Seam upload filter to store the uploaded file in a temp file rather than in memory (https://issues.jboss.org/browse/EMBJOPR-359)
[JBPAPP-5969] for consistency, make sure resource type descriptions and subcategory descriptions all start with a capital letter (https://issues.jboss.org/browse/JBPAPP-5969)
[maven-release-plugin] prepare for next development iteration
[maven-release-plugin] prepare release EmbJopr_1_3_4_SP4
upgrade hornetq plugin from 2.0.0.CR1 to 2.0.0.Final, and upgrade RHQ from 3.0.0.EmbJopr2 to 3.0.0.EmbJopr3
handle ViewExpiredExceptions gracefully (https://issues.jboss.org/browse/EMBJOPR-356)
[maven-release-plugin] prepare for next development iteration
[maven-release-plugin] prepare release EmbJopr_1_3_4_SP3
upgrade hornetq plugin from 1.0.0.Final to 2.0.0.CR1
[maven-release-plugin] prepare for next development iteration
[maven-release-plugin] prepare release EmbJopr_1_3_4_SP2
fix bug that caused plugins to fail to deploy if the plugin jars were symlinks (https://jira.jboss.org/browse/JBPAPP-5276 / https://jira.jboss.org/browse/EMBJOPR-342)
turn off per resource classloaders in the plugin container config at startup
upgrade Seam to the same version used by EAP 5.1; fix SCM connection URLs
    • -203
    • +0
    ./AdminConsole_EAP_5_1/jbas4/pom.xml
rename branch used for EAP 5.1 admin console
  1. … 1185 more files in changeset.
[maven-release-plugin] prepare for next development iteration
[maven-release-plugin] prepare release EmbJopr_1_3_4_SP1
upgrade RHQ from 3.0.0.EmbJopr to 3.0.0.EmbJopr2
cargo.plugin.version -> 1.0.2

repos updated to JBoss Nexus

    • -5
    • +6
    ./EmbJopr-1.4.0-SN-EAP5/jsfunit/pom.xml
[maven-release-plugin] prepare for next development iteration
[maven-release-plugin] prepare release EmbJopr_1_3_4_GA
upgrade RHQ from 3.0.0 to 3.0.0.EmbJopr
remove commented out security-constraint block (https://jira.jboss.org/browse/JBPAPP-4142)
make i18nlog provided, overriding compiled scope from rhq-parent pom, so that jar does not end up included in the admin-console war
upgrade hornetq plugin from 1.0.0.CR2 to 1.0.0.Final
EMBJOPR-250, EMBJOPR-289 - Several fixes to the IEx rendering: navtree height correct in IE6, no content scrollbar in IE6, the tab bar and content borders match up (always in IE7+, almost always in IE6)
EMBJOPR-249 - fixing the login page layout in IEx
    • -1
    • +1
    ./EmbJopr_1_3/core/src/main/webapp/login.xhtml