• last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
aligning dependency with that of EAP as much as possible.
  1. … 9 more files in changeset.
fixing the packaging to include the cms module library
integrating with the new cms module based on upgraded jackrabbit-1.4
  1. … 256 more files in changeset.
Upgrading jboss-cache

Upgrading jgroups

Adding jboss cache library within the CMS SAR for default configuration in AS 4.2.3

  1. … 2 more files in changeset.
JBPORTAL-2075 - CMS failure in jboss-portal-ha when LDAP is used for authentication
  1. … 2 more files in changeset.
- Started upgrading jBPM to 3.2.2.

- Might not work yet (mostly synchronization commit)

- More generification.

- Minor documentation.

- Started fixing wsrp tests. More work needed to upgrade to PC 2.0.0

  1. … 12 more files in changeset.
new theme "renewal" and remove myfaces
  1. … 74 more files in changeset.
- Re-added core-cms and cms to build

- Made core-cms compile

  1. … 2 more files in changeset.
2.7
  1. … 5340 more files in changeset.