• last updated a few seconds ago
Constraints
Constraints: committers
 
Constraints: files
Constraints: dates
Preparing for next dev cycle

[JBWS-3679]:Back port fix to AS713
[JBWS-3677]:Fix ASIL 713
Preparing for next dev cycle

[JBWS-3660] Always stop endpoint through lifecycle handler

[JBWS-3659] Removing JBWS-3441 hack and setting InvocationHandler using an additional DA

[JBWS-3601] Porting WFLY-1667 fix to AS 7.1.3 ASIL

Go ahead with dev

Preparing for tagging

Fixing child pom versions too

Move to the next dev cycle
[JBWS-3524]:fix the jboss712 IL
[JBWS-3611]:fix the jboss713 IL and upgrade the spi and common
[JBWS-3568] endpoint short name is derived from URL pattern
  1. … 4 more files in changeset.
[JBWS-3551] Impl failsafe methods

Removing wrong svn:mime-type props

[JBWS-3565] WS ref optimization
  1. … 8 more files in changeset.
[JBWS-3426] Fixing ASIL 713

fixing svn:ignore
introducing AS 713 IL
    • binary
    ./server-integration/pom.xml
  1. ./server-integration/src/main/java/org/jboss
  2. ./server-integration/src/main/java/org/jboss/as
  3. … 170 more files in changeset.